5.2 Magnum Swap Part 20: Still Assembling

motor-swap-week-20 copy

The days of mocks up are gone, from this point forward everything we bolt in is considered final assembly and is being covered in lock-tight and torqued to spec. Five months into the swap and we are getting very close to being able to turn it over and see how it all comes together.

Continue Reading

5.2 Magnum Swap Part 19: Extending The Engine Cage

motor-swap-week-19

We really liked the way our simple tube bumper looked and didn't want to add anything else to it. This would not only keep a very clean looking font but would also maintain some of the sleeper look we have been trying to keep for as long as possible. The only downside with this design is the radiator is now the highest point and would not be protected in the event of a roll or crash.

Continue Reading

5.2 Magnum Swap Part 15: Custom Tube Bumper

motor-swap-week-15

This week we sent the 5.2 to the shop for some much needed cleaning and rebuilding. With the motor out we had ample room to finish weld some plates, motor mounts and start building our bumper. We ended last week with the lower radiator mounts complete but not much else up front. After getting the stock lights and grill aligned how we wanted, we started with a tube across the front just under the lights. We had planned to...

Continue Reading

5.2 Magnum Swap Part 14: Giant Radiator in a Little Jeep

motor-swap-week-14

At 15% larger, 80% thicker, and a 3” electric fan shroud attached to the back our cooling system quickly became a massive unit to squeeze into the front of the TTBWJ. This week we mount the radiator, mock up the intake, and get up close and personal with our transfer cases.

Continue Reading